Appendix S1: Example performance specification

K41

RAISED ACCESS FLOORS

 

To be read with Preliminaries/General conditions.

 

TYPE OF RAISED ACCESS FLOOR

110

RAISED ACCESS FLOOR TO MEZZANINE

Level of access: Full.

 Floor panel size: 600 x 600 mm.

Installed mass of system (maximum): 40 kg/m2.

Finished raised access floor height above subfloor: 175 mm.

 

 

 

GENERAL

209

STANDARDS

Raised access flooring system: To MOB PF2 PS/SPU.

Manufacturer's quality management system: To BS EN ISO 9001.

210

INTERPRETATION

Authority: References to Authority in MOB PF2 PS/SPU are to the Employer.

211

GENERAL PERFORMANCE

Completed installation: Clean and stable. Free from bounce and vibration. No lipping between floor panels

212

STRUCTURAL PERFORMANCE

Uniform distributed load: 10 kN/m2.

Concentrated loads: 5.5 kN/(300 x 300) mm2.

Point loads: 3.5 kN/(25 x 25) mm2.

Deflection (maximum): 2.4  mm.

213

HYGROTHERMAL PERFORMANCE

Onerous environmental conditions applying: None.

Deemed-to-satisfy test results: Submit, with testing authority's opinion.

215

FIRE PERFORMANCE

Standard: To BS 5588-11.

Fire resistance: Normal.

Thermal properties to BS 476-20: None.

216

SOUND TRANSMISSION

Laboratory system test:

   

 

- Standard: To BS EN ISO 140-12.

 

 

- Test report: Submit.

218

DURABILITY

Fungi, moulds and insects:

 

 

- Tests: To BS 1982 Parts 1, 2 and 3.

 

 

- Preventive measures: Submit proposals.

 

 

  COMPONENTS

220

SAMPLES

Submit representative samples of floor panels with cable management accessories.

225

FLOOR PANELS

Tolerances:

 

- Length of side: ±0.4 mm.

 

- Squareness: 0.5 mm.

 

- Straightness of side horizontally: ±0.5 mm.

 

- Thickness: ±0.5  mm.

 

- Twist: ±0.7  mm.

 

- Vertical warping: 0.6 mm.

Life expectancy (minimum), excluding coverings: 25 years.

Casing material: Steel.

 

 

- Casing finish: Galvanized

Core material: HD particleboard.

Perimeter edging: Pressure-bonded vinyl strip.

Floor panel fixing: Gravity/drop-in.

Floor panel location method: Positive.

Labelling:

 

- Nonstandard panels: Identify for relocation purposes.

 

- Service identification labels: Provide self-adhesive labels to identify under-floor services and their direction. Fix to the visible surface of the floor panel, or under carpet finish if any.

226

PEDESTALS

Life expectancy (minimum): 50 years.

Pedestal fixing: Adhesive

Adhesive fixing:

 

- Selection of test specimens: Submit proposals.

 

- Test results: Submit.

 

- Adhesive: Compatible with subfloor finishing.

Adjustability: Non-adjustable.

 

- Locking: Required

Additional pedestals: At perimeter.

Pedestal materials: Submit proposals.

227

STRINGERS

Type: Submit proposals.

Removable stringers: Submit proposals.

Life expectancy (minimum): 50 years.

Materials: Submit proposals.

229

ACCESSORIES

Service outlet boxes:

 

 

- Type: Separate power and comms boxes.

 

 

- Rate: Locations indicated on drawing MF1.

 

 

- Size (length x width): 600 x 300 mm.

 

 

- Number of power outlets per box: 6 (exp to 8).

 

 

- Number of data outlets per box: 2 (exp to 3).

 

 

- Number of phone outlets per box: 2 (exp to 3).
 

 

- Installation: Drop-in.

 

 

- Lids: Hinged 180º, carpet fixed within lid recess.

 

 

- Frames: Submit proposals.

 

 

- Structural capacity: 7 kN/m2.

Other accessories: None.

   

 

INSTALLATION

235

SUBFLOOR

Type: Sheet particleboard on steel joists.

Cleanliness: Clean before installation and keep clean during installation.

240

PREPARATION

Setting out: Before installation of services, indelibly mark pedestal positions.

Fixtures: Before installation, complete fixtures which floor panels are to be cut around or which supports are to bridge.

Bridging structures - supplementary supports: Not needed.

250

ENVIRONMENTAL CONDITIONS

General:

 

 

- Dry, well ventilated, not subject to extremes of temperature or humidity, and free from rapid variations of temperature or humidity.

 

 

- RH of air (maximum): 75%.

 

 

- RH of surrounding walls (maximum): 75%.

Subfloors:

 

 

- RH (maximum): 75%. Test to BS 8201 using an accurately calibrated hygrometer.

 

 

- Temperature (minimum): 5°C.

330

CUT FLOOR PANELS

Size (minimum): Half full width, full length.

Burrs and rough edges: Make smooth.

Edge sealer: Class 0 spread of flame rated aluminium foil self adhesive tape.

Edge sealing: Seal exposed cut edges of floor panels which have moisture sensitive or combustible cores.

345

RAISED ACCESS FLOOR LEVELS

Permissible deviations in level:

 

 

- Over 3 m: ±1.5 mm.

 

 

- Over all: ±3 mm.

350

EXPANSION GAPS

Expansion gaps:

 

 

- Size: 10 mm.

 

 

- Location: At abutments.

Expansion gap filling:

 

 

- Filler type: Resilient closed cell.

 

 

- Filling: Before fixing skirtings and cover strips.

360

CAVITY BARRIERS

Construction:

 

 

- Material: Self-supporting mineral wool slabs.

 

 

- Fire resistance to BS 476-20:
   Integrity/insulation: 30/- minutes.

Performance: Permanently stable, continuous, and an effective barrier to smoke and flame.

Distribution:

 

 

- Centres (maximum): 10 m.

 

 

- Subdivided areas (maximum): 64 m2.

Fixing: Fix securely to subfloor, at joints and as necessary.

Floor panels: Firmly secure floor panels above cavity barriers.

Gaps between cavity barriers and other elements: Seal with mineral wool or other suitable material.

Fire stopping: Give notice when fire stopping is complete.

390

ELECTRICAL CONTINUITY AND EARTH BONDING

Substantial metal parts of raised access floor: Electrically continuous and fully earth bonded.

 

 

- Standard: To BS 7671.

 

.

- Methods: Submit proposals

Earth bonding connection points: Determine number and location. Provide connectors.

Total resistance of earth fault loop (maximum): Resistance required to operate earth fault protection devices to BS 7671.

Electrical continuity and earth bonding tests:

 

 

- General: Test complete raised access floor.

 

 

- Points for testing: Randomly selected pedestals, stringers, tops and bottoms of floor panels.

Independent test laboratory: Testing Times, Newcastle.

   

 

COMPLETION

420

TOOLS

Floor panel lifting devices: At Practical Completion, supply one set of suitable devices. Train designated personnel in their use.

Pedestal locking: At Practical Completion, supply one set of tools for releasing pedestal locking.

430

USER INSTRUCTIONS

Manual contents: Include the following:

 

 

- Correct method for lifting and replacing floor panels and stringers.

 

 

- Servicing: Limitations on sequence, number and positions of floor panels and stringers which can be removed safely at one time.

 

 

- Permissible loads: With guidance on use of spreader plates when shifting heavy equipment and subsequent maintenance.

 

 

- Methods for installing cabling and ducts, to prevent damage to supporting structure.

 

 

- Cleaning methods.

 

 

- Pedestal adjustment and locking.

 

 

- Maintenance: Recommended methods and frequency.  Minimum maintenance-free life of raised access floor system.  Minimum maintenance-free life of replaceable parts where this differs from that of the whole system.  Minimum period during which replaceable components will be available.

 

 

- Installation instructions, including COSHH Assessment.

440

SPARES

General: At Practical Completion, supply the following: 10 full-size floor panels, 2 half-size floor panels, 1 of each type of service outlet box.

450

CLEANING

Subfloors: After completion, thoroughly clean accessible areas of subfloors and leave free of dust and debris.

Raised access floor: Before delivery of items carried by floor, clean thoroughly.